Mounting

Mounting, by roof.

The frame that holds your panels. Know your roof type and the permits.

Updated November 2026

Illustration of a solar panel on a mounting frame against a dark sky
Illustration, not a real installation.

Know your roof type.

Our quote form asks for one of these: metal sheet (yero), concrete slab, clay or concrete tile, or other / not sure. One other Philippine quote form (Solaric) lists GI Sheet, Clay Tile, Asphalt Shingle, Roof Deck and Other.

4 choices

Metal sheet. Concrete slab. Tile. Not sure.

The roof types on our quote form. Pick yours, or choose Other / not sure.

Permits for the frame.

  • An installer guide says the National Building Code requires a Building Permit for the rooftop mounting structure (SolarPro Install, not official).
  • Micro-solar systems up to 1 kW no longer need a Building Permit (DOE DC2026-08-0017).
  • For qualifying zero-export systems, a Building Permit is not required where the structure already has the applicable clearance (DOE DC2026-08-0017).
  • The city or municipal engineering office issues building and electrical permits (SolarPro Install).

Wind and load figures.

Not measured. Our sources give no wind ratings or roof-load figures. Ask for the mounting datasheet and the engineer's sign-off in writing.

At a glance

Building Permit for the mounting
SystemBuilding Permit
Typical rooftop systemRequired for the mounting structure (installer guide)
Micro-solar, up to 1 kWNot required (DOE)
Qualifying zero-exportNot required where the structure already has clearance (DOE)

Sources: SolarPro Install (not official), DOE DC2026-08-0017.

Questions

Which roofs can take solar?

Our quote form lists metal sheet (yero), concrete slab, and clay or concrete tile, plus Other / not sure. Whether your roof suits solar is checked on site.

Do I need a Building Permit for the mounting?

For a typical rooftop system, an installer guide says yes. Under DOE DC2026-08-0017, micro-solar up to 1 kW does not, and qualifying zero-export systems do not where the structure already has clearance.

Will the mounting survive a typhoon?

Not measured: our sources give no wind ratings. Ask for the mounting datasheet and the engineer's sign-off in writing.