Solar for your home.

Use your own sunshine first. Pick the system type that fits how you live.

Updated November 2026

Illustration of a tropical house with solar panels on its roof
Illustration, not a real installation.

Your home uses solar first.

Under net metering (Renewable Energy Act, RA 9513), your home uses its own solar power first. Eligible power you send to the grid earns a peso credit on your bill (Meralco).

That credit is at the monthly blended generation cost, not the full retail rate, so its value changes month to month (Meralco). Net metering covers up to 100 kW per qualified customer.

10 working days

Faster approval, on paper.

Under the ERC's amended net-metering rules, utilities must process a complete application within 10 working days. LGUs must issue electrical permits within 3 working days and CFEIs within 7 (as reported by Gulf News).

Three ways to set it up.

  • Grid-tied: the simplest set-up. It shuts off during a blackout for safety (EnergySage).
  • Hybrid with a battery: one unit runs the panels and the battery. Some can keep running on solar when the grid is down (EnergySage).
  • Zero-export: made for own use, with safeguards that stop power going to the grid. Since August 2026, qualifying home systems no longer need an ERC Certificate of Compliance (DOE DC2026-08-0017).

What your home needs on paper.

  • For net metering: a local electrical permit and a Certificate of Final Electrical Inspection (CFEI), plus Meralco's application documents (Meralco).
  • Your local transformer sets how much solar can connect. Meralco lists, for example, 7 kW on a 10 or 15 kVA transformer and 10 kW on 25 kVA.
  • A battery can be part of a net-metering system, but it is not automatically approved. Battery and transfer-switch details must be declared (Meralco).

At a glance

Home system types compared
Grid-tiedHybrid + batteryZero-export
During a blackoutShuts off for safetySome keep running on solarNot stated in our sources
Sends power to the gridYes, eligible export earns creditCan, with net meteringNo, by design
PaperworkNet metering: 6 Meralco stagesNet metering; battery must be declaredERC COC waived for qualifying homes

Sources: EnergySage, Meralco, DOE DC2026-08-0017.

Questions

Does home solar work during a brownout?

A plain grid-tied system shuts off during a blackout for safety. Some hybrid inverters with batteries can keep running on solar when the grid is down (EnergySage).

How much do I get for power I send to the grid?

Meralco credits exported power at the monthly blended generation cost, not the full retail rate, so the value changes every month.

How long does net metering take?

Meralco gives no fixed completion date; it depends on permits, studies and inspection. The amended rules require utilities to process a complete application within 10 working days. Real job times are not measured.

Ready to see your own numbers?

Asking is free. Our service fee is included in the quote you receive.