Small plug-and-play solar

Small solar, simple rules.

Up to 1 kW, with fewer papers than a rooftop system.

Updated November 2026

Illustration of a small microinverter for a single solar panel
Illustration, not a real installation.

The 1 kW rule.

  • Micro-solar systems (MSS) up to 1 kW no longer need a Building Permit or an ERC Certificate of Compliance (DOE DC2026-08-0017).
  • The owner only notifies the distribution utility (GMA News).
  • The DOE page does not mention the electrical permit. Check with your city or municipal engineering office.

1 kW

The micro-solar limit.

Up to 1 kW, the DOE waives the Building Permit and the ERC Certificate of Compliance (DOE DC2026-08-0017). Bigger systems follow the usual rules.

What 1 kW can make.

Our estimate for Cavite and Laguna is 3.5–4 kWh a day for each kW of panels, from EU PVGIS sun data. Shade or a poor angle makes less. An estimate, not a promise.

At a glance

Micro-solar vs a net-metered rooftop
Micro-solarNet-metered rooftop
SizeUp to 1 kWUp to 100 kW
Building PermitNot requiredRequired for the mounting (installer guide)
ERC Certificate of ComplianceNot requiredNot covered by our sources
Utility stepNotify the utility6-stage Meralco application

Sources: DOE DC2026-08-0017, GMA News, Meralco, SolarPro Install (not official).

Questions

Do I need a permit for a 1 kW system?

Not a Building Permit or an ERC Certificate of Compliance, under DOE DC2026-08-0017. You notify your distribution utility. The DOE page does not mention the electrical permit.

How much power does 1 kW make?

Our estimate is 3.5–4 kWh a day in Cavite and Laguna, from EU PVGIS data. Less with shade or a poor angle.

Can micro-solar run in a brownout?

Not stated in our sources. Ask whether the kit you are offered has a battery and can run without the grid.