Brownout backup
Power when the grid is down.
A normal solar system goes dark in a brownout. A battery changes that.
Updated November 2026

Why plain solar goes dark.
Ordinary grid-tied inverters shut off during a blackout for safety (EnergySage).
Meralco checks this at commissioning: the system must disconnect within 2 seconds of a grid outage and reconnect after 10 minutes (anti-islanding).
1.9 million
Meralco customers hit on May 13, 2026.
After a Luzon red alert, Meralco dropped load in parts of Bulacan, Cavite, Laguna, Metro Manila, Quezon and Rizal (Daily Tribune). DOE projections show one possible red alert in Luzon and four in the Visayas into early 2027 (Philstar). The Visayas, not Luzon, is most at risk (PIA).
What keeps power on.
- A hybrid inverter with batteries: some can keep running on solar when the grid is down (EnergySage).
- Already have solar? The easiest route is often an AC-coupled battery with its own inverter (EnergySage).
- On net metering, the battery and transfer switch must be declared. It is not automatically approved (Meralco).
Battery type matters in heat.
- Usable depth of discharge: generally 80–95% for LiFePO4, often about 30–60% for lead-acid (Eway Energy, a vendor).
- Each 8°C rise halves the life of a sealed lead-acid battery (BSLBATT, citing Battery University).
At a glance
| Grid-tied | Hybrid + battery | Added AC-coupled battery | |
|---|---|---|---|
| In a blackout | Shuts off | Some keep running on solar | Battery with its own inverter |
| Upfront | Lowest of the three | More than grid-tied | Added to an existing system |
| With net metering | Yes | Battery must be declared | Battery must be declared |
Sources: EnergySage, Meralco. Upfront order is relative only; no prices.
Questions
Will my solar panels work in a brownout?
Not with a plain grid-tied system: it disconnects within 2 seconds of an outage (Meralco). You need a battery set-up that can run without the grid.
Do brownouts happen in Cavite and Laguna?
Yes. On May 13, 2026, Meralco's load dropping hit about 1.9 million customers, including parts of Cavite and Laguna (Daily Tribune). The DOE says Luzon's risk is lower than the Visayas'.
How big a battery do I need?
It depends on what must stay on and for how long. Use our brownout battery calculator with your own appliances.
Sources
- EnergySage: Hybrid Inverters
- Meralco: Apply for Net Metering
- Meralco: Solar and Net Metering
- Eway Energy: LiFePO4 vs Lead-Acid (vendor, search excerpt)
- BSLBATT: Lead-acid battery lifespan by type
- Daily Tribune: Nearly 2M Meralco customers hit by outages
- Philstar: Super El Nino may push power grids into red alerts, warns DOE
- PIA: DOE fast-tracks energy projects to ease El Nino impact
Keep reading
Other solutions
Ready to see your own numbers?
Asking is free. Our service fee is included in the quote you receive.
Get my solar quote