Does solar work in a brownout?

A normal grid-tied system switches off in a brownout, even when the sun is out. This is a safety rule, not a fault.

Updated November 2026

What anti-islanding means

When the grid goes down, crews may be working on the lines. If your panels kept sending power into the grid, the lines could stay live. So grid-tied inverters shut off during a blackout for safety (EnergySage). This is called anti-islanding.

What Meralco checks

When a net-metered system is commissioned, Meralco checks anti-islanding: the system must disconnect within 2 seconds of a grid outage and reconnect after 10 minutes.

How to keep power in a brownout

Some hybrid inverters with batteries can keep running on solar when the grid is down (EnergySage).

How long the battery lasts depends on its size and on what you keep switched on.

Questions to ask

  • Will this system run during a brownout, or only when the grid is on?
  • Which circuits will have power in a brownout?
  • How is the switch-over done, and how long does it take?
  • If you want net metering, have the battery and transfer switch been declared to Meralco?

Sources

See what your roof can do.

Free to ask. No obligation to accept.

Get my solar quote

More guides