Solar panel installation in the Philippines: the steps from quote to switch-on

Going solar is a short project with a few fixed steps. Here is the order, what each step needs from you, and what the 2026 rules changed.

Updated November 2026

1. Your bill and your goal

Start with your monthly electricity bill and what you want: a lower bill, power during brownouts, or both. Your kWh use sets the system size; your goal decides whether you need a battery.

2. Site visit

  • Roof: material, condition, direction and free space.
  • Shade from trees, water tanks or the next building.
  • Your electrical panel and the distance from the roof to the panel.

The site visit confirms the final size and price. An estimate from your bill is only the starting point.

3. Design and written quote

A proper quote names the system size in kW, the number and wattage of panels, the inverter and battery brand and model, what is included (mounting, wiring, permits, net-metering paperwork) and the warranties. Ask for it in writing before you pay anything.

4. Permits

  • Electrical permit from your city or municipal engineering office, signed by a licensed Professional Electrical Engineer.
  • Building permit for the roof mounting, where your LGU requires one. Under the DOE's 2026 circular, micro systems up to 1 kW need no building permit, and qualifying own-use systems need none where the structure already has its clearance.

5. Installation and inspection

The installer mounts the panels, sets the inverter (and battery), and wires everything with the right protection devices. The quote should state how many days the work takes. The LGU electrical inspector then inspects the finished system and issues the Certificate of Final Electrical Inspection (CFEI).

6. Net metering with Meralco

To earn credit for power you send to the grid, you apply to Meralco with the electrical permit, the CFEI and the other documents on its checklist. Meralco replaces your meter after the steps are done. Under the amended 2026 rules, the utility must process a complete application within 10 working days, and LGUs have 3 working days for the electrical permit and 7 for the CFEI. Meralco itself gives no fixed completion date, because it depends on permits, studies and inspection.